Hi everyone,

We are having difficulty generating the door and window reports. All door an windows are plug-in objects and the "include on Schedule" box has been checked, but when we run the report nothing comes up. I'm sure I am missing a small step somewhere but was unable to find much on the boards. 

We are working on a multi-family building with three unit types. The ones that repeat into symbols so that may be the issue but we cant figure it out. Any help would be wonderful. I'd hate to manually do this schedule... 

01.jpeg

02.jpeg

Link to comment

Are you using design layer viewports to organize the units?

 

If so, check the criteria of the database to see if dlvps are included.

 

If you're still stumped, post a file with your window and door schedule and one or two design layers.  Someone will figure it out pretty fast :-).

 

 

Link to comment

Aha!

 

I see what's going on.

 

Open the worksheet "Door Schedule-2".

 

On the left side of the worksheet look for the row header that has a diamond shape then the number 4 then a right arrow.

 

Right click on the 4.  Choose Edit Criteria…

 

There you will see that the checkbox for Include components of symbols is not checked.

 

Check it.  Hit OK.

 

Let the flood of scheduled doors wash over you.  😀

 

Post back if you have any more questions.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...