Jump to content
Developer Wiki and Function Reference Links ×

Workflow tip? switch nodes


RDS Casa

Recommended Posts

Ok, this would work. Also, you have made me think I can just copy and paste the script from the pass node, into the script for what ever node I'm replacing, then wire the new input node into the front end of this. I tried the copy and paste trick before, but if you try and replace a single output node, with a double output node, it really does not like it.

 

I never considered the using the pass first. 

 

Thanks as always 

Edited by RDS Casa
Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...