sinanbader Posted January 31, 2017 Share Posted January 31, 2017 (edited) Hi to all; Do anyone know any way to associate a hoist with a pipe or truss or any element to work together, and take the weight loads automatically. Or do I trim the loads on every hoist manually on every height change? This maybe a noob question but if there is a way I can't find it on forum or resources. Thanks. Edited January 31, 2017 by sinanbader Quote Link to comment
bcd Posted January 31, 2017 Share Posted January 31, 2017 I don't believe there is - partially because this would require implementing some structural analysis that is currently outside the scope of VW. 1 Quote Link to comment
sinanbader Posted February 1, 2017 Author Share Posted February 1, 2017 Thanks for the answer @bcd. I'll keep doing manually but I'll be placing a request for it cause hoists moving on their own is kinda dull tool. Maybe good for the visualisation and drafting but still need some work. I'll try to write a script for it but I don't know be able to achieve. Quote Link to comment
bcd Posted February 1, 2017 Share Posted February 1, 2017 It's a reasonable request - at least they should trim to the Lighting Position hook heights (flat, vertical or raked) and Instruments/LP& Hoists should all lift together. 1 Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.