Jump to content

Door- and window Schedule..


Recommended Posts

Hello!

I'm at the stage of my project, where we need doors- and window schedule.. Like many others, the door and window count is great, and lots of variation in seize = alot of work if we need to draw up / make viewport for every single door- and window type manual.

This is a question if it's possible, and if you've meet any guides online about the subject.

Is it possible to configure the worksheet tabels, so the design of the schedule can be done custom? Secondly, is it possible to get BOTH plan and front view of a single door / window, without manually making viewports for each view instance?

I hope you can help, we're working in 2016..

Link to comment

I think worksheets are your answer.

Any of the door attributes can be represented in a custom worksheet. Use the formula =('door'.'field value') to call it up where 'door' is the name of the door record and 'field value' the name of the field you want to list.

You can even include an image of the door directly in the worksheet using the =image function.

The image can be displayed in front or top view by formatting the cell

You can even change the value of the door parameters directly in the worksheet cell.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...