We have reached the age of digital submissions to permitting departments. To do this, we need to digitally sign all drawings, date, and issue pdf's to the department.
If we could have this performed through something like the Issue Manager - "Sign and Seal all checked sheets" it would be an amazing savings in time.
A recent example had us doing the following:
1. Plot 9 sets for City of Orlando Permit Department - yes, 9
This took 6 hours to plot
2. Sign and Seal all sheets
This took 4 hours, 2 sittings, one sore hand
3. Assemble and prepare for delivery
This took 3 hours
If we could just do this from the Issue Manager and pdf directly to the building department, it would have taken less than 1/2 hour
13 hours minus 1/2 hour = 12 1/2 hours of saved time!!!!!!!!
You can post now and register later.
If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.
Question
Rob Glisson
We have reached the age of digital submissions to permitting departments. To do this, we need to digitally sign all drawings, date, and issue pdf's to the department.
If we could have this performed through something like the Issue Manager - "Sign and Seal all checked sheets" it would be an amazing savings in time.
A recent example had us doing the following:
1. Plot 9 sets for City of Orlando Permit Department - yes, 9
This took 6 hours to plot
2. Sign and Seal all sheets
This took 4 hours, 2 sittings, one sore hand
3. Assemble and prepare for delivery
This took 3 hours
If we could just do this from the Issue Manager and pdf directly to the building department, it would have taken less than 1/2 hour
13 hours minus 1/2 hour = 12 1/2 hours of saved time!!!!!!!!
PLEASE, PLEASE, PLEASE!
Link to comment
6 answers to this question
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.