ChrisA Posted February 6, 2014 Share Posted February 6, 2014 Hi When I generate a schedule using tools/reports/va create schedule, the schedule that gets generated has multiple doors with the same ID. When I use the "select item" option form the spread sheet, the door on the schedule appears but none of the options are selected that would place it on the schedule. I cant get rid of them. Any ideas? Thanks Chris Quote Link to comment
Jonathan Pickup Posted February 6, 2014 Share Posted February 6, 2014 look out for the worksheet finding doors on other layers. Quote Link to comment
michaelk Posted February 6, 2014 Share Posted February 6, 2014 Also check the criteria to make sure you aren't including doors in design layer viewports. mk Quote Link to comment
ChrisA Posted February 7, 2014 Author Share Posted February 7, 2014 Hi How do I set the criteria to not include the viewports. I have looked at the spread sheet function options (paste criteria) and used the custom setting to create the different criteria but I am still getting a lot more doors then what is in the project. Thanks Quote Link to comment
Vectorworks, Inc Employee PVA - Admin Posted February 7, 2014 Vectorworks, Inc Employee Share Posted February 7, 2014 (edited) Edit the criteria by right-clicking or control-clicking (rather than Paste Criteria) on the database header row, then uncheck the options for show Design Layer Viewports: [img:center]http://techboard.vectorworks.net/ubbthreads.php?ubb=download&Number=10283&filename=No%20viewports.PNG[/img] Edited February 7, 2014 by JimW Quote Link to comment
ChrisA Posted February 7, 2014 Author Share Posted February 7, 2014 for some reason when I right click on the data base header the "set criteria" option is greyed out. Quote Link to comment
Vectorworks, Inc Employee PVA - Admin Posted February 7, 2014 Vectorworks, Inc Employee Share Posted February 7, 2014 Ahh I always use Tools > Reports > Create Report, which generates a slightly different schedule. I am not sure if there is a way to alter it on the VA Create Schedule version, in that case. Quote Link to comment
ChrisA Posted February 7, 2014 Author Share Posted February 7, 2014 I see that but it is not nearly as good looking and a bit more work.There has to be something I am missing. Quote Link to comment
ChrisA Posted February 8, 2014 Author Share Posted February 8, 2014 AH HA! it appears that during the initial design process I had put in duplicate doors that were not showing up when i got to the CD portion of the design. It wasn't until I isolated layers and turned on and off classes that I found them. Cheers Chris Quote Link to comment
visard Posted May 2, 2016 Share Posted May 2, 2016 Thanks guys. I also found duplicates in other layers. This conversation helped a bunch. Cheers, Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.