Jump to content
Sign in to follow this  
Chad McNeely

Floor area worksheet question

Recommended Posts

As far as I can tell, there isn't a pre-made floor area worksheet.

I created a floor area record and attached it to my floor objects. The worksheet reports area correctly on some, but double on others.

Any ideas why?

Share this post


Link to post

...which I had done previously.

I thought it would be cleaner, and especially more error-proof, to use the actual floors. I *have* to move them as my plan progresses, and it's tedious and easy to forget to move the space objects as well. Now that I don't have to inset my floors to allow for an additional textured bit on the edges, the floors seem even more useful for this. Is that unreasonable?

Share this post


Link to post

and to further clarify, I'm looking for area to outside of walls, as would be reported on a site plan. Not individual room areas. I don't see a way of accomplishing that with the automatic updating version of the space tool. I have converted a copy of the floor poly into a space object (classed invisible), which then needs editing (and remembering!) with each change.

Share this post


Link to post

It is super easy.

YOU DON'T NEED TO CREATE YOUR OWN FLOOR AREA RECORD.

Create a worksheet, make a row into a Database.

Set Criteria to "Type is Floor"

The formula you need for the floor area is simply "=Area/144" don't type the quotes.

The 144 is because by default it will give you square inches and I wanted S.F.

(Those in metric can figure out what you are getting to determine if you need to add a division)

picture6fn2.png

Share this post


Link to post

OK, it seems whenever I create a schedule, it asks what record-based objects I want to point to. I'll dig a little harder to figure out the non-record criteria bit.

I used CriteriaArea in the first post question, and was getting either the area or double the area for different floors. I've since rebuilt the floors, and am getting consistent double area, so adding /2 has given me a workable solution for now.

Thanks.

Share this post


Link to post

chad,

don't use the create schedule command,

rather just make a blank worksheet with

a database in it as per GMM18's example above

Share this post


Link to post

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

 

7150 Riverwood Drive, Columbia, Maryland 21046, USA   |   Contact Us:   410-290-5114

 

© 2018 Vectorworks, Inc. All Rights Reserved. Vectorworks, Inc. is part of the Nemetschek Group.

×
×
  • Create New...