Nick

Welcome to the forums. As you can see, there are some very funny(?) people here.

It is helpful if you put a signature on your posts, so we can see what system you are running.

You incorporate a basement level by using Layers. You can leave the ground floor layer as Level 0 and give the basement floor a negative level or you can start with the basement floor at 0.

Link to comment

If you plan on doing sections & elevations using the DTM, then set the Layer baseline elevation to the site 00 elevation. This will allow you to determine the correct floor elevations, and whether or not they are '+' or '-' values. Avoid negative values whenever possible to simplify cut&fill and sitework. For example, setting the 00 benchmark downslope of the lowest footing elevation.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...