focuseddesign Posted January 25, 2008 Share Posted January 25, 2008 (edited) Has anyone else had problems with SL2008 and really slow convert to instrument/numbering processes? I've been working on a plot for 2.5 hours now because it takes at least 5 minutes each time I convert to an instrument, enter a position, and number. Sometimes longer to do all three tasks. No other applications running, Windows Vista, some new high speed dual core processor, 2G of ram. There's less than 200 units...I should have been done the entire plot by now. Glenn Edited January 25, 2008 by focuseddesign Quote Link to comment
Vectorworks, Inc Employee klinzey Posted January 25, 2008 Vectorworks, Inc Employee Share Posted January 25, 2008 Make sure you update to VectorWorks 2008 SP2. There was a general application slowdown that was fixed with one of the service packs since the initial release. Quote Link to comment
focuseddesign Posted January 25, 2008 Author Share Posted January 25, 2008 It has already been updated to SP2. Glenn Quote Link to comment
Jim_Allen Posted January 28, 2008 Share Posted January 28, 2008 (edited) Why don't you use the instrument insertion tool when you insert an instrument?, then you don't have to convert them. are you entering the instrument info throught the OIP?? Also position should automatically get entered when you place an instrument on a named position. Jim Edited January 28, 2008 by Jim_Allen Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.