Jump to content

Accurately aligning referenced layers


Recommended Posts

However, if you choose to offset the origin in File-B and then WGR into File-A which has the origin at the Drawing Center 000, then just as Pete indicates the Layer origins align to 000( Drawing center )...

but if you had set-up of the File-B plans to use an offset origin ... then they will be out of alignment by the XY of the offset in File-A.

Link to comment

That's precisely the issue. Dealing with drawings from multiple consultants and multiple formats (anyone ever work with Softplan?). I think I have a better handle on how to get this done though. The main issue is the lack of a consistent common point to lock into the 0,0,0 point.

thanks for the input

Link to comment

you create a layer link for the workgroup referenced layers that you bring in

in 12.5.1

there is a query if you want to LL when you firt create the WGR

at the bottom of the dialog box

then you can locate/rotate/flip the layer link

which will get updated when wgr is updated.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...