Jump to content

Door data fields/schedule


olly

Recommended Posts

Hi,

I am using the VA schedule to generate a door schedule,

I have filled the information I want to display in the data field of each door, but I have some issues with the "rough/masonry opening" values, I would like to set myself independently from the other door parameters, is it possible ?

Thanks.

Olly

Link to comment

Choose the door in the drawing you want to make the change to.

Go to the OIP and click on the Settings button.

Under the Data tab, make the change to the rough masonry opening item by choosing it in the large white box and typing in the change in the smaller white box below.

Link to comment

I have no problem doing that Katie, but it doesn't record what I entered.

After typing the information, I valid, then quit settings. If I reopen the settings it display again the default value I don't want to have.

Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...