Jump to content

2025 Hoist insertion


Stefan B.

Recommended Posts

Hey,

 

So, it is added an additional step when inserting hoists on a truss. While a single click is no longer enough, there is a need to choose the rotation of the hoist. Like any other symbol. While this is good, that stuff gets handled the same, and i most likely are getting used to the new function and will appreciate it in time it does not work properly in 2D plan.

 

As I in 99% of the time would like no rotation to the hoist symbol in 2D plan, my initial goto method is to hold shift to lock the axes for my second hoist insertion click. This snaps to strange angles and doe not behave as i would expect it to. In Top view it works like a charm snapping to the axis.

 

 

 

 

 

  • Like 1
Link to comment

I didn't find an issue with it snapping to weird angles, maybe because I quickly found the easiest way to insert with normal rotation is to double click. Just seems faster than trying to set the rotation with the extension line and another single click.

 

I did say I found the enforced second click frustrating. If people out there really want to rotate hoists and/or there is a desire for consistency across tools then sure, but the Lighting Device tool has now gained a single click mode...which we've now lost from the Hoist?

 

IMO the hoist should have the same single click mode available as the LD. All of my users will select it and never change it...

Link to comment
  • Vectorworks, Inc Employee
1 hour ago, Stefan B. said:

I do not understand how this is not found in alpha or beta testing.

It was. Added yours to the list. 

 

57 minutes ago, spettitt said:

I did say I found the enforced second click frustrating. If people out there really want to rotate hoists and/or there is a desire for consistency across tools then sure, but the Lighting Device tool has now gained a single click mode...which we've now lost from the Hoist?

 

I'm working on a task to add the single and distributed functions now avail w lights to the hoists. It'll take some time.

Link to comment

It would be a great feature to be able to add multiple hoists as in fixtures. Naturally, with the hoist actually connecting to the truss.  Very often I know the beam spread in the roof and would know that the hoists need to be 10m apart to hit a beam. In other situations the truss goes paralell to the beam and I know the load and can beforehand know what the hoist spread should be.

  • Like 1
Link to comment
  • 3 weeks later...

Hey,

 

May i add another new feature that i don't think is on purpose?

If in recourse manager double click on a hoist to activate the hoist tool and insert that hoist, the hoist you double clicked is not the one being inserted. Either the last one you inserted is active or the hoist hook, unless you change hoist symbol selection in the toolbar. Is this as intended?

 

 

 

Link to comment
  • Vectorworks, Inc Employee

Hi @Stefan B.
This is definetly a bug with the resource manager, I can verify that I'm having the same issue.
It looks like it only affects the resource manager though so if you use the resource selector in the hoist tool it will insert the chosen host type correctly.
I'll get a bug report opened

  • Like 1
Link to comment

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...