I would love to be able to issue sheets with different revision numbers. If I have 10 sheets of drawings, and make a change on only 1 sheet, then that sheet would become rev1, while the others remain rev0. If I make another change, then that sheet would become rev2, and the others remain rev0. I would only plot the revised sheet for the builder.
You can post now and register later.
If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.
Question
zero
I would love to be able to issue sheets with different revision numbers. If I have 10 sheets of drawings, and make a change on only 1 sheet, then that sheet would become rev1, while the others remain rev0. If I make another change, then that sheet would become rev2, and the others remain rev0. I would only plot the revised sheet for the builder.
Link to comment
1 answer to this question
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.