Jump to content

Search the Community

Showing results for tags 'window schedule'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Announcements
    • Announcements
    • News You Need
    • Job Board
  • Feedback
    • Roadmap
    • Wishlist - Feature and Content Requests
    • Known Issues
    • Wishes Granted / Issues Resolved
    • Forum Feedback
  • General
    • Troubleshooting
    • General Discussion
    • Architecture
    • Site Design
    • Entertainment
    • Vision and Previsualization
    • Braceworks
    • ConnectCAD
    • Energos
    • Rendering
    • Workflows
    • Buying and Selling Vectorworks Licenses
    • Hardware
  • Customization
    • AI Visualizer
    • Marionette
    • Vectorscript
    • Python Scripting
    • SDK
    • 3rd Party Services, Products and Events
    • Data Tags
  • Solids Modeling and 3D Printing
    • Subdivision
    • Solids Modeling
    • 3D Printing
  • Vectorworks in Action
  • Archive
    • Resource Sharing
    • Machine Design

Calendars

  • In-Person Training - US
  • In-Person Training - UK
  • Coffee Breaks
  • Essentials Seminars
  • Webinars
  • Community Groups

Categories

  • Knowledgebase
    • Tech Bulletins
    • Troubleshooting
    • Workflows
    • How To
    • FAQs

Categories

  • Marionette - Objects
  • Marionette - Networks
  • Marionette - Nodes
  • Marionette - Menu Commands

Product Groups

There are no results to display.


Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Occupation


Homepage


Hobbies


Location


Skype

Found 5 results

  1. Can we please have a Preformatted Report added for a combined window and external door schedule, assuming 'W' ID Prefix for both windows and external doors (and assuming internal doors have a different ID Prefix, 'D')? It will require IF statements, as noted here by Pat: https://forum.vectorworks.net/index.php?/topic/104578-door-and-window-schedules-combination/#comment-455772
  2. In a Window Schedule Report (or just a simple Worksheet) is it possible to call up the thickness of wall that each window is inserted into? I want to do this to help tenderers do take-offs for the various sill depths they need to allow for.
  3. Hi all, I'm having some hard time with window schedules because the Sill is always coming with the window height function, even when we have in the tool the selection of "Structural Opening" which by default should include the sill height in, like the door threshold does, but when we add the sill to the window it adds literally the height of the sill but it doesn't add it to the "structural opening" size in the GENERAL OPTIONS for the window. Example is having a 1200mm height window (general options - Structural opening) if i add the sill of 50mm what will happen to the overall size of the window is going to 1250mm height instead of the sill being incorporated in the overall height of 1200 making the "Unit Size" smaller So with the above in mind is there a way of using the worksheet functions to "remove" the height of the sill while having it on the drawing so i can have a Realistic Structural size of the window opening ?? Hope i was clear on my explanations.
  4. Hello All I am sure this has been covered before, all I want to do is add a quantity column to my window schedule and to summarize the windows that are the same and have a total count. So I have 5 W01 windows, I can het it to summarize so I don't see each W01 listed but I cannot figure out how to have a quantity column which seems like it should be easy. Can anyone help? Thank you very much
  5. Our office is doing a residential development with 3 model plan types. We have all three plans drawn and set up in one VW file. How can we differentiate between the different plan types for the door and window schedules? So all of the doors and windows for unit A on the Unit A door and window schedule, same with plan B & C. Right now the schedule recognizes all of the doors and windows in the file. So all of my door for unit B and C are on my Unit A door schedule. The different plan types are on different design layers. I tried editing the criteria in the schedule to the refer to a specific design layer, but it list over 300 items (and I do not have 300 doors). Any suggestions out there?
×
×
  • Create New...