Jump to content

Search the Community

Showing results for tags 'process'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Announcements
    • Announcements
    • News You Need
    • Job Board
  • Feedback
    • Roadmap
    • Wishlist - Feature and Content Requests
    • Known Issues
    • Wishes Granted / Issues Resolved
    • Forum Feedback
  • General
    • Troubleshooting
    • General Discussion
    • Architecture
    • Site Design
    • Entertainment
    • Vision and Previsualization
    • Braceworks
    • ConnectCAD
    • Energos
    • Rendering
    • Workflows
    • Buying and Selling Vectorworks Licenses
    • Hardware
  • Customization
    • AI Visualizer
    • Marionette
    • Vectorscript
    • Python Scripting
    • SDK
    • 3rd Party Services, Products and Events
    • Data Tags
  • Solids Modeling and 3D Printing
    • Subdivision
    • Solids Modeling
    • 3D Printing
  • Vectorworks in Action
  • Archive
    • Resource Sharing
    • Machine Design

Calendars

  • Training Events
  • Coffee Breaks
  • Essentials Seminars
  • Webinars
  • Community Groups

Categories

  • Knowledgebase
    • Tech Bulletins
    • Troubleshooting
    • Workflows
    • How To
    • FAQs

Categories

  • Marionette - Objects
  • Marionette - Networks
  • Marionette - Nodes
  • Marionette - Menu Commands

Product Groups

There are no results to display.


Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Occupation


Homepage


Hobbies


Location


Skype

Found 2 results

  1. Is there a way to have VW provide the volume of an excavation created using an extrude along path ?
  2. i tried to create the flow chart. but i am stuck in middle. can anyone help in creating? Driver backs up the truck into one of the available docks.For full truck loads (FTL) the forklift driver checks the seal to be intact, and matches it with the seal number on the PL/BOL. If seal doesn’t match, he reports to the receiving clerk. Receiving clerk contacts the buyer and fills out the “discrepancy form”. If buyer doesn’t approve the discrepancy, the truck is rejected without breaking the seal. If buyer approves, the forklift driver unloads the goods from the truck and stages them in the receiving area. He counts the goods, and visually inspects the packaging and the parts themselves. If there is a shortage/discrepancy, or if packaging is damaged, he takes pictures, lists the damages/shortages on the BOL, as well as the form, and has the driver sign it. The forklift driver then fills out the “Visual Inspection (VI) Form” by matching the “Packing List (PL)” with the shipment and notes any potential quantity or visual defect issues. Receiving clerk should put a red tag on damaged goods. Damaged goods are moved to quarantine for further inspection. The receiving clerk logs the data under “Incoming QC” in “SmartSheet”. “SmartSheet” sends a notification to the QC inspector. If the load is intact, or the non-damaged portion of the shipment are staged in the receiving area, and are tagged with orange labels “inspection required”. The “VI” form and a copy of the PL are passed to the QC, and another copy goes to the inventory controller. QC inspects the shipment, and passes the “inspection report” to the inventory controller. Inventory controller receives the number of goods that passed the inspection in the ERP system. If there is a discrepancy, shortage, or quality issueQC inspector makes a note under “SmartSheet”. The buyer then follows through the “MRB (Material Review Board)” process.
×
×
  • Create New...