Search the Community
Showing results for tags 'drawing schedule'.
-
Ever since Title Blocks were revamped a couple years ago, I've been unable to create a simple Drawing Schedule (list of sheets) as a worksheet that's linked to my Sheet Layers / Title Blocks. It used to be as simple as pulling record fields from the Title Blocks, but that doesn't seem to work anymore, so I'm obviously missing something. Note that I DO NOT want to use Tools < Reports < Create Sheet List, as this creates an unlinked worksheet (an idea with I completely loathe). In my workflow I constantly re-name and re-number sheets throughout a project, so I need a worksheet that is always up to date without having to manually do anything. I see that it's possible to pull some data from TBBs, as seen in the screenshot of my test below: All I really need is 'Sheet Data'.'Sheet Title' but that doesn't seem to work? For my first column I just used =L in the column header which works fine to pull the sheet layer number. Here's an image of my simple goal, which I had in VW2017: @Nikolay Zhelyazkov @Pat Stanford
- 26 replies
-
- 2
-
- drawing schedule
- sheet list
-
(and 3 more)
Tagged with: