Jump to content

taverneiro

Member
  • Posts

    5
  • Joined

  • Last visited

Reputation

0 Neutral

Personal Information

  • Occupation
    Architect
  • Location
    Curitiba, Brasil
  1. Hello all, so I exported a design layer as DWG, and when I opened it on AutoCAD it had two lines of everything. I tried to export a simple square slab just to test it, and again when I deleted the lines there where another set of 4 lines beneath it. Does anyone else have this kind of problem too? Any light on how to solve it? I'm using VW 2013 SP1. Thanks!
  2. ok, updating: I had to multiply by COUNT and then divide by COUNT. Something like (Door.DoorWidth)*C4/C4 - C4 beeing my COUNT column. I'm glad it finally worked, but still have no clue why it had to be this way (shouldn't (Door.DoorWidth)/C4 be enough?) Any hint?
  3. Thanks, Pat - that was simple and logic... but somehow it didn't work =( I inserted 4 doors (all equal), added the COUNT column and then divided all other columns by the COUNT cell. My door width is 90, and I expected that multiplying 90*4 and then dividing the result by 4 again it would return 90. Somehow it's returning 22.5! any clue?
  4. Is there any reference guide where I can find all field names I can use in a record for a custom title block?
  5. Hi all, I need to make a list of doors/windows, and I've been using the following method: - creating a door/window record, with all the field I want; - creating a door/window symbol, and attaching the record to it; - creating a report listing all the symbols with my custom door/window record. All this work is costing me a lot of time, and it bugs me to do it this way since there is the "VA create schedule" command, and I could do it simply using the door tool. My problem is: I can't find a way to summarize items with the same field value (like "all with the same ID label"), which is required for my work. I've tried adding the "sum" to a schedule column, but then it adds up all fields, which is not my desire. Is there any way to do it like in the record report, but using the "VA create schedule" command?
×
×
  • Create New...