Jump to content

ljiggins

Member
  • Posts

    2
  • Joined

  • Last visited

Everything posted by ljiggins

  1. A2 drawing takes 8-9 minutes running mac os x 10.4 tiger. On the old 800ps same job took 2-3 minutes. anyone got the same setup and having a problem?
  2. hmm, thats interesting. Are you using this on a network and are you using Vectorworks 2008 service pack 2. I am having problems with jobs taking 8-9 minutes, where as on the old 800ps they took 2-3 minutes! what os x version also are they running?
×
×
  • Create New...