I entered about fifty stake points ranging from 15' to -35'. The 3D site model appears to be correct, but the 2D contours only show -35' to -5'. I did verify that the minimum and maximum elevations were set correctly and I put the datum at 0". Ideas?
I'm trying to draw property lines for the first time. Followed the kbase tutorial, entered my bearing and distance, but I don't get a line. Any thoughts?
quote:
Originally posted by HMP:
How do you set stairs in plan so that they go down in section? Even though I set them up with "down" arrows and everything I still end up with steps going up from whatever floor I'm putting the on.
I've found the answer to this in the manual...and a dummy stair that goes up and click the "not 3d" option in the object info.
How do you set stairs in plan so that they go down in section? Even though I set them up with "down" arrows and everything I still end up with steps going up from whatever floor I'm putting the on.
How do you connect two gable roofs that are not the same height (width)at right angles. Picture an L-shaped plan? It should be pretty routine, but my conversations with tech support have elicited no help.
------------------
--HMP