Often we need to work on large buildings with many spaces. This generates many window, door and room symbols or objects. Unfortunately all these objects are attached to the single window, door or room record that is created to link these objects to their respective schedules. When the schedules are set down on their respective sheets for plotting, they run well off the bottom of the sheet because they are so long. I have taken to creating additional records and schedules (Door Record2, Door Schecule2, etc.), along with additional objects attached to these new records, and this works up to a point. Unfortunately I can't use the Room Name tool and the Assign Room Finish tool to operate on the objects attached to the new records. In order to assign room name and room finish info I have to manually enter all information in the OIP's Data pane for each secondary window, door or room name object. Obviously, all objects in the drawing attached to the first or default records can take advantage of using the Room Name and Assign Room Finish tools, but once the number of these legitimate objects is such that the schedules they are on reach the bottom of the drawing sheets, all other objects have to be assigned to the alternate records and manually fleshed out - a tremendous waste of time. To make matters even more complex, occasionally some drawing action will inadvertently reassign the default record to objects assigned to the secondary record, and then the objects start showing up on several schedules.
I've spoken to a tech representative about all this, but there is no help forthcoming apparently. I would like to know if anyone else has developed a clever way to handle long schedules. Thanks.