  1. Your work flow is backwards to the way we do it.

    We typically set our sheets to 24x36, and PDFs from them can be printed at that size to scale. If we want 11x17 prints of them in the office because we can print them fast and/or because they are a convenient size to take to a client meeting or the site, we just adjust the scale of the page setup to 50% (if scale is important) or something like 45% if we want to get the whole sheet on the 11x17.

  2. JohnA, you might be wanting a gently curving set of stairs, such as you might see in a park.

    If so, use the 'extrude along path' command; first draw your steps even as lines in section, group them, then draw a 'path' which you will use as the plan layout for the stairs. Select both, choose the command, select the object for the path, and you will get what you want, I think.

  3. Mog, disregard my post above.

    I just easily inserted a Velux skylight directly into a roof object, symbol and all complete with correctly sized opening.

    Perhaps there is something special about a skylight object (like 3D loci) that have to be provided to do what I just saw.

  4. Mog,

    I don't believe that (in 2011 anyways) you can actually insert a skylight symbol in a roof object at all. It does what it is doing for you now only, i.e. inserts a hole for it. You do have to place the skylight manually.

    There is a video on YouTube which I viewed recently which goes over this exactly. Check that out for confirmation.

    Mitch

  5. I keep looking at your two attachments and they look the same to me; both have treads which are 400 mm wide.

    Look at it in elevation or section; I think you will see that what you have drawn is what you want.

    Or do I need more coffee?

  6. Matthew, for clarification: my question would be: what arrangement do you want in the resulting DWG files? Do you want 1 DWG file for the design layers of each of the two files (i.e. 2 DWG files), and another DWG file for the sheet layers? Or 1 DWG file for the design layers of each file AND the sheet layers?

    The DWG export has improved a lot since VW 2008 too.

  7. Jason,

    This is certainly a work around but it worked for me just now.

    Select all of the notes on the drawing; use the "magic wand" tool if you have it (I am not sure it was available in 2010). In the Object Information Pallette, turn off their designation as key notes. Then turn them back on again. When I did that, my key notes legend reappeared.

    Good luck.

  8. It seems to me that Elena drew the content on the 1:1 layers, then changed the scale to 1:48. Now that content is 48 times smaller than she wants.

    Elena, try this: select all content on those layers and using the Modify/Scale Items menu item, increase their size by a factor of 48. If there is text in that content, make sure you select the box to scale text.

  9. As far as I know, there is no way to indicate to VW how it should interpret the direction of the swing. One door in one wall swinging one way could be construed to be a simple left swing or a reverse right swing, depending which way you are considering or viewing the door.

    Partly because of this, we have given up indicating the swings on door schedules which we usually prepare in Excel in any case. It doesn't seem to have caused any problem. That information usually comes back to us as part of the shop drawings, both in the door and in the hardware shop drawings.

  10. Alfresco,

    This may not work because you don't have Architect, but the standard door and window schedules that Architect users can access from the Tools menu, Report/Create Schedules/VA Window Schedule produces a schedule with this information in it. Actually it produces a schedule with everything in it from the door PIO, which is normally way too much.

    I don't know if you can access this from Designer, or something like it.

    If not you should be able to create a worksheet schedule that includes those items. Don't try to adjust the schedule; input the desired gap in the PIO dialog box. Perhaps this is not as quick as working from the schedule however.

    As an architect, I don't generally include RO information anymore. A good contractor will know what the RO should be from the given size of a window, no?

×
×