Jump to content

805eng

Member
  • Posts

    3
  • Joined

  • Last visited

Everything posted by 805eng

  1. We're love to make connectcad more efficient. currently one has to create the equipment AND a drop point. I'd much prefer if the equipment was also a drop point. Alternatively, how can we add notations to the drop point symbols?
  2. Thx for the response. I see the "sum" value in the header and can add "=H2" in a spreadsheet row. But it's not a sum so much as it is a count. There are 14 rows in this list (12 have estimated length) 6*12 = 72 14 = rows/circuits in the report We'd like to total the estimated cable length
  3. We'd like to sum our estimated cable length in a report. I seem to be able to sum "spreadsheet" values, but not "database" values When I tried to sum a cell it only sees the whole integer example summing database rows H2.1 through H2.23 will show as =sum(H2..H2) and report #Value! of course if I sum spreadsheet rows H2 through h44 =sum(h2..h44) is works with no errors There is a built-in sum values filter but, I don't see where the sum is posted. note: in the same column I do have record that report -- as their droppoints have not been placed on the plan design layer yet.
×
×
  • Create New...