So as a commercial drone pilot and a landscaping designer, I elected to fly a house under construction in a wooded area to map it for 3D modeling.
I utilized the maximum # of images (500) for processing. It took 24 hrs to process, but only created a point cloud file. No 3D textured mesh files were created.
Would this be because it reached the 24 hr time-out limit and it had only created the point cloud file up to that point in time?