Hi Jesse,
thx for the answer.
I'm currently working on SP2 Build 574483, I've tried the SP3 on my MacPro 2014 but crashes wen I calculate. On SP2 it doesn`t crash.
I will try SP3 on my macbook today.
Hi,
why is the load on my hoists 0 if they are connected on a bridle?
I also want to know what the load is of my Hoists so that we know how many % the are already loaded.