I am trying to create a schedule for my stairs, but am struggling to find how to pull specific data from the stair plug-in (such as number of risers, pitch, tread length etc). The Ifc data available when creating a worksheets for stairs is very limited and doesn't have what I'm looking for. Is it possible to take data from Pset_StairCommon or if is there another way?