Hi all,
I'm working on a theatrical venue where everything in the building is raked (the balcony, the stage, the auditorium floor). Most of the doors in the building are in walls at either the top or bottom of the rake, but there are two openings on the stage where the bottom of the cased opening needs to follow the rake of the floor. Does anyone have any tips or tricks to accomplish this?
Screenshot attached for clarity.Thanks in advance!