Jump to content

Cornwall Design

Member
  • Posts

    3
  • Joined

  • Last visited

Reputation

0 Neutral

Personal Information

  • Location
    United Kingdom
  1. Need a fix asap please! The work arounds suggested here are so time consuming
  2. I second this, it's completely ridiculous to not be able to use the eyedropper tool to copy attributes between landscape areas. This was working perfectly in previous versions, it's enough to make me want to roll back! The work arounds are so time consuming. Needs a fix asap!!
  3. Hi Everyone, Please can someone tell me how to add the plant distribution rate to a planting schedule/worksheet? My current worksheet is set up to show plant name, quantity, pot size etc. I've set the distribution rate in the Landscape Area Settings. What formula do I need to add to the top of the new column in the worksheet to show this distribution rate? Many thanks in advance!
×
×
  • Create New...