Hi there,
I'm designing a truss structure using the integrated Insert Truss function and I'm using Prolyte H40V elements straight from the Resource Manager.
If I put a C003 (L- piece) down, then try to attach a horizontal 300cm straight truss to it, it ends up at the wrong side. (image attached)
Because Vectorworks does not automatically connect the two elements in the right way together, my calculations in Braceworks fail.
With the Prolyte H30V items I don't have any troubles..
Hopefully someone can help!
Thank you!