Jump to content

DaleW

Member
  • Posts

    10
  • Joined

  • Last visited

Everything posted by DaleW

  1. Hi Nikolay, I was able to achieve this by going into the wall style, then -> edit wall attributes -> and selecting 'use component line attributes'. Then in the window OIP, at the top it has a drop down menu for 'Break', I selected 'full break with caps' and it achieved the result I was after. As always, thanks for your help.
  2. Hi, Does anyone know how to set a thickness for the break/cap line for a window or door? I would like the make it match the wall as below. Thanks
  3. I've been trying to connect the below roof and wall so the components join: It would be great if there was a join tool that could connect components between walls, slabs & roofs. this would be perfect for construction documentation. Without this tool I have to trace over each junction such as the above in annotations which is annoying.
  4. Anyone got any ideas how to connect this wall & roof so the components follow through? Vectorwork's biggest downfall for me is its lacking ability to connect slab, roof and wall components to each other. It would be great if there was a join tool that worked between these items.
  5. Ok, I've got something to work now... Thanks! It seems a bit confusing that I have to add Issue Data when I'm trying to record revisions, especially as I have revisions on my TBB and not issues. I would expect the Project Revision History to track Revision Data and the Project Issue History to track Issue Date. I find I have to add both a revision and issue to my TBB to get both the Sheet Revision Log & Project Revision History to work, and have it show correctly on each TBB. What is the difference between Revisions and Issues in VW? Why is there not just one or the other?
  6. How do I create a new issue? Is this different to creating a new revision within the TBB? I usually use Revision Data over Issue Date. In the below image I have created revisions 'Test 1' & 'Test 2' which are showing on the TBB but not on the Project Revision History.
  7. Hi Nikolay, Thanks for the response. I'm using the Sheet Revision Log and it works well, I want the Project Revision History to give me a general overview though and show previous revisions. How do I get the Current Revision Number to show on the Project Revision History worksheet? You say I need to issue the TBB? Thanks.
  8. I cant seem to get the revision history to appear on the 'Project Revision History' worksheet. I have my title bar set up correctly with data types set to 'Revision Data.Number' etc... However these aren't appearing on the worksheet. Any ideas?
×
×
  • Create New...