Jump to content

bc29

Member
  • Posts

    1
  • Joined

  • Last visited

Reputation

0 Neutral

Personal Information

  • Location
    United States
  1. We have a relatively simple trail project - a 10'wide by 400'long new trail. We have surveyor DTM which made for a clean Site Model. We have the proposed centerline of the trail. That's when I get stuck. Would you consider a trail design to be a use of the Roadway(Poly), Roadway(Nurbs), or Site Pad with Retaining Edge tools? Need: -Flexibility to modify running slope and cross slope together. -Auto-Stationing. Is that too much for these Landmark tools? Thank you for any advice you may have.
×
×
  • Create New...