Jump to content

Greta Jonsson

Member
  • Content Count

    2
  • Joined

  • Last visited

Posts posted by Greta Jonsson


  1. We've just started using the tool and are having similar problems. The 'conflicts' most often refer to notes with different headings, say 'Existing upper floor upgraded' and 'New upper floor' and suchlike.  

    Any insights would be very welcome indeed.

    Thank you.


  2. Hi Michaela

    It may be overly complicated if your project is small.

    If it involves various colleagues working on different files (plans, elevations, sections, details, services) then they can all be referenced into the master file which is used to generate the drawing package. 

    Sounds like you've got a big task to do if you are new to Vectorworks .. Good luck

    Greta

 

7150 Riverwood Drive, Columbia, Maryland 21046, USA   |   Contact Us:   410-290-5114

 

© 2018 Vectorworks, Inc. All Rights Reserved. Vectorworks, Inc. is part of the Nemetschek Group.

×