Jump to content

Ellora Design

Member
  • Posts

    1
  • Joined

  • Last visited

    Never

Reputation

0 Neutral

Personal Information

  • Occupation
    designer
  • Location
    Portland
  1. Deke, I have the same problem, it makes establishing a reference very slow when the drawing has many layers. My MAJOR problem with referencing is the inabilty to archive and backup reference files. It is essential that backed up files are allowed to retain the links of that particular series of drawings. There should be an option to "archive" a complete set of drawings in the workgroup reference dialog. Without this capability, referencing is not a viable option, and is too time consuming to use in practice. "Instant updates" to a set of drawings is not reality when one has to establish each layer and drawing reference everytime you backup a set of documents.
×
×
  • Create New...