Jump to content

zeno

Member
  • Posts

    929
  • Joined

  • Last visited

Everything posted by zeno

  1. it works. From silicon to silicon. From Intel to Silicon was a total disaster
  2. MBP 16 M2 max 92 GB RAM 9:36
  3. Hello. What do you mean by DP? I have a 43 and I have no problems
  4. Good morning I would like to report an important BUG for CW windows. By copying and pasting the same window, they change the size. Trying the file on Big Sur DOES NOT HAPPEN. I'm about to try on windows. CW windws VENTURA.MP4 PS: Maybe it's a matter of SP2 and not the operating system. I’m testing PS2: it’s a regression from SP1. Tested on monterey, win11 and Ventura @Stephan Moenninghoff can we talk with someone? PS2: VB-192280 created
  5. If you understand it, it's malware If you don't understand it, it's design yo 😅
  6. Guys everybody know that Vectorworks is a software for architects. It’s only a automatic decontructivism function. Come on!
  7. Are there some other issues out of renderings, actually?
  8. Ok I'll do it actually I need to extract all auto hybrid from my project. That's the only way to get quantity materials for solids and components
  9. OMG sorry but I didn't understand. I missed the "de" of "selecting", my mistake. Ok. Actually me too now shows the quantities on that file even if it's not what I expected. If I can: if I exclude that selection I read the quantities of solids inside the autohybrids (why? but ok) If I have to read the wall components in the same worksheet where the materiali is on autohibrids object, how should I do it? Thanks PS: there is also this question about quantities material
  10. Hi Matt Thank you for answering I confirm that he can't read the quantities materials. But for now the road is simple because it sees the object but does not read the quantities, presenting a zero that is immediately understood. From the worksheet I'm going back to the autohybrids, which are still inside symbols, so I'm solving pretty fast. And yes: every time the quantities change as expected For the BUG there is already the VB-191520. I hope it can be resolved quickly. We have many other projects to do Thanks
  11. I'm working on the final list and it's interesting because you can also understand several errors that are present in the model. Studying in detail I noticed that autohybrid objects do not allow you to calculate the quantities of materials. I also posted the VB-191520 @Matt Panzer please can I ask you in advance if you know a method to solve the problem? maybe i'm making a mistake like the one in the beam a few days ago. Thank you
  12. He we go. 1 tower concrete on the right, total amount on 3 towers on the left seems working well
  13. Good morning I found a way, it works and I'm happy because I'll be able to proceed with my work. To define a list of materials for design layer you need to: - a worksheet where you define only the criteria ‘material x is present’ and ‘design layer is..’ - the total sums are in the first row at the top of each criterion Comes a spreadsheet miles long because for now you can't merge the elements, so you need to: - another spreadsheet where you can report the data of the individual cells (connected) My opinion is that something smarter should be done in this direction. If the developers believe that my contribution can be useful, just write me in PM. Otherwise I can give my opinion and say that there is a big lack in the potential of the worksheet and materials for architectural projects. Thanks for the support
  14. I found the discussion more than a year ago made with@sbarrett So confirm what I thought: it's not possible to do what I need. I ask you what we can do: I think it is unacceptable that such an operation cannot be done for an architectural project. Can we all try to work together and solve this problem? I think it can interest a lot of people. What do you think about it? Thank you
  15. I think that criteria "type is material" Locates the material resource in the drawing, like a resource list is not compatible with "design layer is ..." Or can't do it. Material database takeoff derives 69 items. So I have to keep finding few materials in each design layer!
  16. Issues 1- Material Takeoff - Database get a correct full list 2- If I add "layer is --" whit "all criteria in this set" the worksheet is empty 3- If I add "layer is --" whit "any criteria in this set" the worksheet don't allow me to merge materials
  17. Thank you all for the support Excuse me, maybe I don't know enough about the software. I can't find the point to assign the design layer. Can I ask you to attach a screenshot, a small video? I need to figure out exactly which worksheet you're talking about and how to try to do this. Thanks in advance
  18. I need something similar, but able to split the quantity for each design layer
  19. @sbarrett good morning I seem to remember that some time ago I asked you something similar. But I'm not sure. The problem lies in easily defining the quantities of materials from objects such as walls or slabs with many components. For every single design layer. Each component has a material. The worksheet couldn't (and I still can't) merge the names of the materials to quickly calculate everything. It is a very important project, it could be a good thing to show. May I ask you what you think? Did you get to do some rehearsals? Thank you in advance
  20. Using any material is present, I need to check the quantity inside component wall etc. By this way, the quantity are not merged and see every single wall. Can I send you via PM a message with a dedicated link? thanks
  21. Good morning I am trying to obtain the area and volume of the materials to be derived for each design layer. In a linear and simple way. I've been trying for a long time, I haven't been able to do it yet. Has anyone been able to clearly extrapolate this data? Thank you
  22. yes, you can call it “super matryoska symbol level 4” 👍🏻
  23. Good morning Matt. I am still currently using a CW window with other objects modeled and converted to autohybrid all togheret in a symbol in walls which in turn have inserted beam objects as symbols. The problem had been resolved, but I had to reinsert the windows AFTER making the update. Unfortunately, project sharing has never been used. I don't know people who have the ability to handle complex projects with VW. Thank you
×
×
  • Create New...