About 2 years ago we have upgraded from 12.5.3 to VW2011 and to be honest we had not much joy since. Initially, we struggled migrating one project but gave up and simply only started new projects in VW2011? thinking this would make a difference!
We are mainly working with large residential developments, in the range of 300-600 apartments, which requires a lot of symbols and referencing of multiple files. Note we do not even bother using 3d, we try to keep everything as simple as possible drawing everything in 2d? yes even elevations & sections.
The major problem we are facing is that references are extremely slow to update - the problem as usual occurs randomly thus can not be reproduced easily.
To be honest what is well beyond us is that a software released in 2011 does not seem to be able to handle 2d drawings which are referenced into each other with file sizes of around 80-120MB - btw. why they are that size in the first place is rather questionable as well.
We are told that we are pushing the software, so we thought we ask around on to understand how other offices handle projects of the aforementioned size? surely we are not the only ones working with Vectorworks at that scale?
As 2014 is about to be released and support for VW2011 will be stopped, we are looking down the barrel of once again upgrading in the hope of improvement or switching to another software altogether.
Does anybody have positive experiences with large scale projects and VW - maybe you have figured out the sweetspot beyond which it simply does not work properly?