So I am finally getting to play around with VW 2010, which I found has some awesome new features. However, I have a few questions about the drawing coordination feature that automatically corresponds information on drawing labels, title block etc. when a VP is created.
1) When I insert a "stock" title block with drawing boarder, the sheet number in the TB does not update to coordinate with the sheet layer sheet number. Is there a step I am missing?
2) When I insert a drawing label on the floor plan, in annotations, then move the VP to a different sheet the label does not update. Is it supposed to?
Thanks in advance for your responses:)