My present employer is curious about the benefits of using viewports, he feels that it is a time consuming process. Previously he worked with saved views. I only have experience in working with the viewports so I am unable to comment on the use of the saved views as I have no point of reference.
Our drawings are only used for 2D as we don't use VW for presentations. We are trying to come up with a standard in the office and we each have our preferences. I learned to stack all of my drawings and have found this method beneficial however, there are some benefits to drawing everything on the same design layer as it allows you to quickly reference all of the drawings.
Any advice?